The same multiplier can produce two different prices because the measurement starts from a different anchor. Follow real USD/JPY H1 candles, keep A/B/C fixed, and compare an extension from A with a projection from C. The projected D* is a price reference, not a future extreme already known to the chart.
1. Compare the same known anchors
The rising example fixes A = 141.280000, B = 142.200000 and C = 141.490000 JPY per USD. The complete A/B/C selection becomes available at 2024-01-02 18:00 UTC. Blue, gold and violet horizontal lines show the chosen construction at multipliers 1.000, 1.272 and 1.618.
Platforms use extension, expansion and projection labels in different ways. MT4 Help describes its Fibonacci Expansion as a three-point object. This guide declares two formulas explicitly and compares their geometry; it does not claim that every platform tool or default setting uses the same endpoint convention.
| Leg | A · JPY per USD | B · JPY per USD | C · JPY per USD | Selection first known UTC |
|---|---|---|---|---|
| Rising AB | 141.280000 | 142.200000 | 141.490000 | 2024-01-02 18:00 |
| Falling AB | 144.670000 | 143.650000 | 144.250000 | 2024-01-08 23:00 |
2. Extend the A-to-B move from A
The two-point formula is E(q) = A + q × (B − A). E(1) returns B. E(1.272) continues 27.2% of the original signed move beyond B; E(1.618) continues 61.8% beyond B. The multiplier describes the total distance from A, not an additional 127.2% beyond B.
For the fixed rising anchors, E(1.272) = 142.450240. The 1.272 and 1.618 inputs are fixed rounded decimal multipliers in this lesson. They are not exact irrational constants, probabilities or expected returns. Keep the origin and the signed B − A distance visible when checking a platform drawing.
E(q) = A + q × (B − A)
E(1) = B
q ∈ {1.000, 1.272, 1.618}3. Project the same signed distance from C
A projection starts the measured A-to-B distance at C: P(q) = C + q × (B − A). In the same example, P(1.272) = 142.660240. It differs from E(1.272) by C − A, which is 21.00 pips for this selection. Changing the multiplier alone cannot remove that difference.
Switch the construction while keeping the interval, A/B/C selection and multiplier unchanged. The price table shows both answers side by side. In this lesson both modes wait for the same complete A/B/C selection so their comparison uses one availability rule. The two-point formula itself needs only A and B.
P(q) = C + q × (B − A) P(q) − E(q) = C − A
| q | E(q) = A + q(B − A) | P(q) = C + q(B − A) | P(q) − E(q) · pips |
|---|---|---|---|
| 1.000 | 142.200000 | 142.410000 | 21.000 |
| 1.272 | 142.450240 | 142.660240 | 21.000 |
| 1.618 | 142.768560 | 142.978560 | 21.000 |
4. Keep the minus sign on a falling leg
For the falling example, A = 144.670000, B = 143.650000 and C = 144.250000. B − A is negative, so adding a positive multiple of that signed distance projects downward. Do not replace B − A with an absolute value inside the price formula.
At 2024-01-08 23:00 UTC the complete selection is known. D* = P(1) is 143.230000 JPY per USD. This is a lower projected price from a falling A-to-B leg. The direction describes the measured leg; it does not establish a bullish or bearish trade recommendation.
5. Wait until the selected C is available
The lesson uses a strict two-left/two-right pivot check on consecutive recorded hours. A center price is known as an observation before it can pass that later confirmation. Equality fails the relevant pivot check, and a center that qualifies as both a high and a low is discarded.
In the early-C example, the observation cutoff is 2024-01-02 17:00 UTC. C is still provisional and supplies no selectable A/B/C construction. Advance one recorded hour to 2024-01-02 18:00 UTC: confirmation is complete, the selection appears, and its levels are fixed. Later pivots can create another selection but never rewrite this one.
6. Read AB=CD as an equal price-leg projection
D* = C + (B − A) makes D* − C equal to B − A. This is the equal-price-leg geometry represented by AB=CD. It does not require equal elapsed time, equal numbers of candles, or a 45-degree line on a chart. The illustration marks a projected price without inventing a future D date.
A later observed price near D* does not turn it automatically into a confirmed turning point. This guide does not add every ratio condition of a complete harmonic-pattern definition. If a later strategy uses AB=CD, it must separately define availability, the allowed zone, confirmation, execution and risk.
D* = P(1) = C + (B − A) D* − C = B − A 1 pip = 0.01 JPY/USD
7. Separate a price range from a fill or a reversal
The later illustration uses a frozen D* = 146.380000. At 2024-01-11 15:00 UTC the selected completed interval has Low = 145.720000 and High = 146.400000. Its recorded range encloses that reference. This example was selected retrospectively to explain the comparison; it is not a performance sample.
Only intervals after the A/B/C creation interval enter the later-range scan. At creation there is no subsequent completed interval yet. An enclosing OHLC range does not prove that a quote or fill occurred at the exact calculated price. Missing observations can also let Close move beyond a reference without any recorded interval enclosing it.
| Interval start UTC | Open | High | Low | Close | D* · JPY per USD |
|---|---|---|---|---|---|
| 2024-01-11 14:00 | 146.230000 | 146.400000 | 145.720000 | 145.890000 | 146.380000 |
8. Keep price units and data limits explicit
For this USD/JPY lesson, 1 pip = 0.01 JPY per USD. The retained quotes have two decimal places. Calculated levels are displayed with six decimals for transparent arithmetic; those extra places do not add quote precision or specify a tradable price increment.
The January dataset contains 530 observed H1 intervals, 4 with fewer than 60 source minute records, and 4 gaps between recorded hours. No replacement candles are inserted. The anchor construction uses its own declared confirmation rule rather than the historical ZigZag calculation in the previous guide. No trade, cost-adjusted return or reversal probability is calculated.
9. Change one measurement choice at a time
First select the completed H1 interval: this changes what was available. Then select an A/B/C construction already known at that cutoff. Finally choose extension or projection and the multiplier. The comparison checkbox overlays the other construction using the same frozen anchors and multiplier.
Use the early-C example and advance one interval to see the selection become available. Use the later-range example to compare the recorded OHLC with a level fixed earlier. The value cards explain each control; formulas, the anchor table and downloadable CSV remain available for an independent check.
Inspect the construction available at each completed hour
Change the cutoff first, then the known anchors, construction and multiplier. The comparison uses the same anchors; no future D candle or trade is created.
The interactive example could not load. Use the static charts and downloads.
Load a teaching example
- What this observation shows
- —
- Information complete through UTC
- —
- Available confirmed selections
- —
- This A/B/C selection first known UTC
- —
- Fixed anchor A
- —
- Fixed anchor B
- —
- Fixed anchor C
- —
- A-to-B price distance · pips
- —
- Direction of the measured A-to-B leg
- —
- Selected construction and q · JPY per USD
- —
- Other construction, same q · JPY per USD
- —
- D* = P(1) · JPY per USD
- —
- P(q) − E(q) · signed pips
- —
- Selected completed quote Close
- —
- Chosen level versus this later Low–High range
- —
- Close versus the level along A-to-B direction
- —
- First later enclosing interval · start/end UTC
- —
- Signed distance from Close to chosen level · pips
- —
Source quotes have two decimal places. Six-decimal calculated prices add no source precision and do not specify an executable increment.
On a narrow screen, scroll the chart horizontally. The value cards above remain readable.
Missing clock hours are omitted. Range enclosure does not prove an exact quote, touch time or fill.
Calculations use exact decimal ratios. Axis labels are rounded; classification compares the unrounded level with observed OHLC.
Show the exact calculations
Show the displayed observed candles
| Interval start UTC | Open | High | Low | Close |
|---|
Frequently asked questions
Why do two tools show different 1.618 prices?
Check the formula, origin, direction and exact anchor prices. E(1.618) starts at A, while P(1.618) starts at C. Labels and endpoint conventions vary across tools; the same displayed multiplier alone does not identify the same calculation.
Is a 1.272 extension 127.2% beyond B?
Under this guide’s E(q) convention, the total distance from A is 127.2% of B − A. The additional distance beyond B is 27.2%. Reading the origin incorrectly changes the projected price.
Why does the two-point mode wait for C here?
The lesson deliberately compares both formulas on the same confirmed A/B/C selection. That selection is fixed only when C is confirmed. A standalone two-point tool can use A and B without C; that is a different selection workflow.
Is projected D* already a confirmed future pivot?
No. D* labels P(1), a calculated equal-leg price. It does not identify when that price will be reached, whether an observed range will enclose it, or whether a reversal will follow.
Does AB=CD require equal time for the two legs?
Not in the price equality used here. D* − C = B − A specifies the signed price distance only. A time-symmetry condition would be a separate rule and is not assumed in this guide.
Can a range enclosing the level prove a trade filled?
No. OHLC shows the recorded interval’s extremes, not every quote, executable side, spread, queue or fill. This lesson reports range enclosure and Close position; it places no orders and calculates no trading performance.
Data, calculation method and scope
The retained Forexite USD/JPY minute CSV is checked against its saved SHA-256 before aggregation. Source labels use GMT+1; January labels are converted by subtracting one hour for UTC, then grouped in (hour end − 1h, hour end]. Each H1 interval is labelled by its start and becomes complete at its stated end.
The original daily-archive URLs and hashes are retained as earlier provenance; the original ZIP bytes were not reverified in this task. The downloads contain the exact hourly OHLC, all 45 immutable A/B/C selections, the frozen method, example-selection rules and independently written calculation code.
The first rising and falling examples are selected by declared legibility rules and availability order. The later range-enclosure illustration is an explicitly retrospective teaching selection. No entry, stop, target outcome, win rate or native-platform execution is inferred from these figures.